Manitowoc CVD1375 Especificaciones Pagina 27

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 204
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 26
–17–
Refrigeration Line Set Installation
Refrigeration line set installation consists of vertical
and horizontal line set distances between the ice
machine and the condensing unit. The following
guidelines, drawings and calculation methods must be
followed to assure proper oil return and CVD
®
Condensing Unit/ice Machine operation.
Step 1. Prior to installation of the ice machine and
CVD
®
Condensing Unit be sure that the distance
between them is within the line set routing guidelines
outlined in this manual.
Step 2. Properly route refrigeration tubing between the
Ice Machine Head Section and the CVD
®
Condensing
Unit.
For a roof/wall penetration, cut a 3-in. (76.2 mm)
circular hole in the wall or roof for routing of
refrigeration tubing, as required. A qualified person
must perform all roof penetrations.
A. LINE SET LENGTH
!
Warning
Potential Personal Injury Situation
The ice machine head section contains the
refrigerant charge. Installation and brazing of the line
sets must be performed by a properly trained
refrigeration technician aware of the dangers of
dealing with refrigerant charged equipment.
!
Caution
QuietQube
®
Ice Machines will not function with line
sets greater than 100 ft. (30.5 m). Do not attempt to
go beyond this distance and add refrigerant charge
to compensate!
Vista de pagina 26
1 2 ... 22 23 24 25 26 27 28 29 30 31 32 ... 203 204

Comentarios a estos manuales

Sin comentarios