Manitowoc CVD1375 Especificaciones Pagina 194

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 204
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 193
–192–
9. Follow the normal evacuation procedure, except
replace the evacuation step with the following:
A. Pull vacuum to 1000 microns. Break the
vacuum with dry nitrogen and sweep the
system. Pressurize to a minimum of 5 psig.
B. Change the vacuum pump oil.
C. Pull vacuum to 500 microns. Break the vacuum
with dry nitrogen and sweep the system.
Pressurize to a minimum of 5 psig.
D. Change the vacuum pump oil.
E. Pull vacuum to 250 microns. Run the vacuum
pump for 1 hour additional.
10. Charge the system with the proper refrigerant to the
nameplate charge.
11. Operate the ice machine for one hour. Then, check
the pressure drop across the suction line filter-drier.
A. If the pressure drop is less than 2 psig, the
filter-drier should be adequate for complete
cleanup.
B. If the pressure drop exceeds 2 psig, change the
suction line filter-drier and the liquid line drier.
Repeat until the pressure drop is acceptable.
12. Operate the ice machine for 48-72 hours. Then
replace the suction line drier and change the liquid
line drier.
13. Follow normal evacuation procedures.
Important
Dry nitrogen is recommended for this procedure.
This will prevent CFC release.
Vista de pagina 193
1 2 ... 189 190 191 192 193 194 195 196 197 198 199 ... 203 204

Comentarios a estos manuales

Sin comentarios