Manitowoc CMS050A004 Especificaciones Pagina 72

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 88
  • Tabla de contenidos
  • SOLUCIÓN DE PROBLEMAS
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 71
72
IMPORTANT
Manifold gauges must be removed properly to
ensure that no refrigerant contamination or loss
occurs. A quick disconnect is required for the
high side connection.
Recovery/Evacuation
1. Place the toggle switch in the OFF position.
2. Install manifold gauges, charging scale, and
recovery unit or two-stage vacuum pump.
3. Open the high and low side valves on manifold
gauges.
4. Perform recovery or evacuation:
A. Recovery: Operate the recovery unit as
directed by the manufacturer’s instructions.
B. Perform a nitrogen pressure test to verify
leaks are not present.
C. Evacuation prior to recharging: Pull the
system down to 500 microns.
NOTE: Check access fittings for leaks with an
electronic leak detector after charging the ice machine.
Vista de pagina 71
1 2 ... 67 68 69 70 71 72 73 74 75 76 77 ... 87 88

Comentarios a estos manuales

Sin comentarios